top of page
Writer's pictureIEN Consultants

Greywater & Rainwater for KKR2 building

Updated: Apr 20, 2021

IEN is invited to give a talk about the greywater and rainwater system installed at the KKR2 office building, which is targeting to score all the GBI water efficiency credits as well as targeting to achieve GBI Platinum. The IEM Mechanical & Electrical Forum talk is given at the Institute of Engineers, Malaysia (IEM) and includes measured data and lessons learned. Interestingly, the measured potable water consumption of the KKR2 (Block G building) is 63% lower than for the neighbouring Block F building.


Download the program (click).


Presentation:


Comentarii


bottom of page