top of page

Tonasco HQ and production facility recorded energy savings

Updated: Apr 20, 2021

In May 2013, Tonasco commissioned IEN Consultants to carry out a Energy Efficiency consultancy for the retrofit of their soon to be new office at Bukit Jelutong, Shah Alam.


The brief was simple. Tonasco was moving their current operations (Office & Production) to a new premise which would be 30% larger (by Gross Floor Area) but would like to keep the energy bills the same or lower than the current energy bill. The new HQ and production facility has now been in operation for long enough to publish the recorded savings.


Project write-up about the key strategies and recorded savings:



bottom of page